Social Housing – Sheffield

4 Tower Blocks

Case Study Description

TYPE
Retrofit | Social Housing Blocks | 45m in height
COMPLETION TIME
4.5 months per block
AREA
Sheffield
PUMP QUANTITY
1 SKID Pump per block
NOZZLES QUANTITY
2400+ nozzles

Background

iMist™ were contracted to install a system into each of these 4 tower blocks in Sheffield, to protect the residents. Full retrofit of the entire system was required to be as minimally invasive as possible, as all works would be carried out around residents’ day-to-day lives.

To make this as simple as possible for them, we used surface-mounted flexi pipe and boxed the pipe in with pendock.

Solution

384 apartments have been covered with the iMist™ system, ranging from 1 to 2 bed flats over a span of 14/15 storeys.

iMist™ will maintain and service the systems yearly to maintain pump warranty and ensure the systems and components are working efficiently.